In some older government buildings, you cannot hang a picture without asking first. Where there is asbestos, no one can put a nail or any other hole in a wall until they know what is in it. Asbestos in good condition and left alone does not release fibres. Drilling, cutting or sanding can release them.
On December 30, 2018, Canada’s ban on importing, selling and using asbestos came into force. For most of the twentieth century, Canada was one of the world’s largest producers, and a town in Quebec carries the mineral’s name. Asbestos went into insulation, flooring, ceiling tiles and pipe wrap across the country. According to WorkSafeBC, it remains the leading cause of work-related deaths in British Columbia, because the diseases it causes appear decades after exposure. The ban does not cover asbestos already in buildings, and much of it will stay there for years.
British Columbia’s Occupational Health and Safety Regulation requires employers to keep an inventory of asbestos-containing materials in their workplaces and to make it available there. The standard changed in 2012. Materials now count as asbestos-containing at a lower concentration, and inventories have to cover buildings built before 1990, not only those built before 1980. People have a right to know what is in the walls of the buildings they work in.
In early 2016, after a chance introduction at a café, I was brought in as a communications contractor for a sensitive matter. A division responsible for government real estate was starting a new asbestos inventory of its older owned and leased buildings, and it had inventoried its owned buildings under the old standard years earlier. I started the communications plan with the hardest question people would ask: why had government not already done this? The answer was the change in the standard, and the plan said so directly.
It can be tempting to say as little as possible about asbestos, in the hope of not alarming anyone. Organizations also worry that explaining will invite questions they cannot yet answer. But people notice when inspectors arrive to take samples, and they ask what is going on. I wanted employees to hear the reason from us first, before they heard it from a coworker: what the inventory was, why it was happening now and what it meant for their building. Occupants would be told the inspection dates and procedures in advance, and once a building was assessed, its report would be kept at the worksite, as the regulation requires.
The risk communication researcher Peter Sandman describes risk as hazard plus outrage. Hazard is the technical danger. Outrage is how people feel about it, and Sandman lists the factors that drive it up. Asbestos carries almost all of them. It is dreaded, because it is linked to cancer. It is memorable, after decades of news about mines, lawsuits and sick workers. It is invisible and slow, with diseases that appear decades after exposure. And it is controlled by others: employees do not choose the building they work in or what is in its walls. Outrage rises further when people distrust the source or suspect they are not being told everything.
Sandman’s advice is to treat outrage as legitimate rather than as a misunderstanding to correct. That means acknowledging people’s concerns, being open about what is known and not yet known, and giving people some control. The plan built in regular chances for occupants to ask questions and raise concerns as the project went on, not only at the start.
The inventory itself posed almost no hazard, because the testing did not disturb anything. The bigger risk was the word asbestos. So the key messages I wrote said plainly what the inventory was not: it was not a response to a hazardous situation, and it was not removal work. They explained what asbestos does and does not do. Material in good condition and left intact does not release fibres. It becomes hazardous when it deteriorates or is disturbed by sanding, drilling or breaking, which is why no one could put a nail in a wall where there might be asbestos. They said what would happen if a problem were found: a plan to deal with it would be put in place right away. And the questions and answers took on the questions people were most likely to ask, including whether their health was affected and when they would know about their own building.
Vincent Covello’s message mapping, used widely in public health, starts with a small set of core messages prepared before anyone asks a question, with every answer built from them. I wrote the inventory’s core messages first and built every product from them: briefings for senior leaders, letters to landlords, questions and answers for facility managers and messages for the union. There were more than ten audiences. The products differed in length, tone and detail, but not in fact. Core messages are a source, not a script. If every product repeats them word for word, they start to sound rehearsed, so each product used the same facts in the words its audience would use.
I planned the order as carefully as the content. Leaders heard before staff, and staff before landlords, and the regulator was kept up to date throughout. The union representing employees heard by telephone, and I wrote the core messages for that call so its questions could be answered as they came up.
Most of the offices were leased, so the inventory could not simply be ordered. Landlords had their own obligations and concerns about cost and reputation, and the plan treated them as partners. Robert Heath, a scholar of issues management, writes that organizations earn legitimacy by bending to the community rather than expecting the community to bend to them.
When an organization I work with faces a requirement it did not choose, I start with one page of core messages: what is required, why, what it means for the people affected, what happens next and where to find more. We get that page approved once. Then we list every audience in the order they should hear, decide what each one needs, and build each product from the same page. The page is dated and updated as facts change.
FURTHER READING
Peter M. Sandman, Responding to Community Outrage: Strategies for Effective Risk Communication (American Industrial Hygiene Association, 1993).
Vincent T. Covello, “Best Practices in Public Health Risk and Crisis Communication,” Journal of Health Communication 8, supplement 1 (2003): 5–8.
Robert L. Heath, “Issues Management”, in The International Encyclopedia of Strategic Communication (Wiley, 2018).
Government of Canada, “The Government of Canada takes measures to ban asbestos and asbestos-containing products” (news release, October 2018).
Related service: Crisis and issues management
About the author
Alesha Hayes, MA, APR, is principal of A. M. Hayes & Associates, a communication and public relations practice based in Victoria, British Columbia. Her work brings together strategic communications, organizational development and public engagement, with attention to how decisions are made, how people become involved and what it takes to earn their trust.
Alesha writes from her own experience and uses AI tools to help draft and revise.
Subscribe to Insights for new writing on communication, organizations and public life.